Skip to content
MGPMGP InfrastructurePrivate Limited

Telecom Infrastructure

IME — Infrastructure Maintenance

Preventive and breakdown maintenance for site infrastructure equipment.

MGP technician performing preventive maintenance on a site diesel generator inside a telecom shelter, checklist and tool kit visible.

What this service is

In plain terms.

IME — Infrastructure Maintenance — is the technical care of everything on a telecom site except the radio itself: the diesel generator, the air conditioners that keep the shelter within temperature, the battery bank that carries the site through a grid outage, the SMPS power plant and the site electricals. Preventive rounds prevent most failures; the rest is breakdown response.

Scope of work

What a standard engagement includes. Anything outside this is quoted separately and agreed in writing before it is executed.

AC preventive maintenance and servicing
DG preventive maintenance, servicing and major breakdown repair
Battery bank preventive maintenance and cell replacement
Power plant and SMPS maintenance
Site electrical fault attendance
Diesel fuelling and consumption reconciliation
Site cleaning and grass cutting
Material movement — SRN, MRN, new material dispatch and old material return to warehouse

Enquire about this service

An engineer who works on this specific service will call you back.

We use your details only to respond to this enquiry. We never sell or share them.

How we execute it

From enquiry to handover.

Six defined stages. You always know which one you are in and what closes it.

01

Asset register

Every DG, AC, battery bank and power plant in scope is recorded with make, capacity, serial number and current condition.

02

PM calendar

Preventive maintenance is scheduled per asset class with defined checklists and intervals.

03

Preventive rounds

Each round is executed against its checklist and closed with readings, photographs and consumable records.

04

Breakdown response

Faults are attended within the SLA window, with root cause and spare consumption recorded.

05

Material movement

New material dispatch and old material return move on formal SRN and MRN documents.

06

Reporting

Monthly asset health, PM adherence, breakdown count and mean time to restore.

Battery bank cells being tested with a hydrometer and digital tester in a shelter.

Equipment

  • DG and AC servicing tool kits
  • Battery bank testing and load-bank equipment
  • Electrical measurement instruments — clamp meters, multimeters, insulation testers
  • Diesel dispensing and measurement equipment
  • Material movement vehicles

Team on the job

  • DG and AC technicians with OEM-pattern training
  • Site electricians
  • Battery and power plant specialist
  • Store and material coordinator

Compliance governing this work

  • IP1 Licence — Department of Telecommunications
  • Electrical Contractor Licence for site electrical work
  • Documented lock-out and tag-out for equipment maintenance
  • Full statutory labour cover for all technicians
See every licence and registration

On site

IME — Infrastructure Maintenance in execution.

These slots are reserved for MGP's own site photography of this exact service.

Battery bank cells being tested with a hydrometer and digital tester in a shelter.
Air conditioner outdoor unit being serviced on a telecom site.
SMPS power plant panel being inspected with a clamp meter.
Material being loaded against an MRN document for warehouse return.

Before you commit

Questions buyers actually ask.

Answered directly, including where the honest answer is a qualification rather than a yes.

Either model works. Most clients keep spares in their own warehouse and we consume against SRN; where a client prefers it, we procure and bill spares at agreed rates.

Need ime — infrastructure maintenance?

Send us the site details and the scope you have in mind. If a survey is the sensible first step, we will say so rather than quoting blind.

Prefer to talk?+91 88308 89392
CallWhatsAppEnquire