Telecom Infrastructure

Telecom Tower Cluster Maintenance Programme

Preventive and breakdown maintenance across a cluster of ground-based and rooftop telecom sites, combining structural upkeep, site energy and housekeeping in one contract.

Client

Confidential — Telecom Infrastructure Provider

Location

Pune, Pune

Year

2024

Duration

Ongoing annual contract

The challenge

What the client was up against.

The cluster was previously split across three vendors — one for structural work, one for DG and diesel, one for site cleaning. Every outage produced a dispute about whose scope had failed, and the operator's circle team spent more time arbitrating than managing the network.

Our approach

What we actually did.

MGP took the full cluster under a single contract. An opening condition survey established a documented baseline per site. A combined preventive calendar allowed one visit to cover structure, DG, battery bank and site cleaning instead of three separate mobilisations, and a single escalation number replaced three.

Before and after

Drag the divider.

Opening condition on the left, completed work on the right — from the same position, so the comparison is honest.

BeforeAfter

Equipment deployed

Fall-arrest and climbing systems
Earth resistance and insulation testers
Metered diesel bowsers
Emergency response vehicles

What the client got

One accountable vendor across structure, energy and site upkeep
Geotagged photographic evidence for every preventive visit
Monthly fuel reconciliation against DG running hours
Single escalation path for outage response

From site

Execution photographs.