Building Construction

Factories, offices, hospitals and institutional buildings.

What this service is

In plain terms.

A building is delivered, not merely built. Between the foundation and the handover sit structure, masonry, plaster, waterproofing, flooring, joinery, painting and the mechanical, electrical and plumbing services that have to be coordinated with all of it. MGP executes industrial sheds and factory infrastructure, commercial and office buildings, hospital and institutional structures, and residential works — with the MEP interface handled in-house because we hold the electrical licence ourselves.

Scope of work

What a standard engagement includes. Anything outside this is quoted separately and agreed in writing before it is executed.

Foundation and substructure works
RCC framed structure — columns, beams, slabs
Masonry, plastering and waterproofing
Factory sheds and industrial infrastructure
Hospital and institutional buildings
Commercial, office and mall infrastructure
Flooring, joinery, painting and finishing
Mechanical, electrical and plumbing coordination

Enquire about this service

An engineer who works on this specific service will call you back.

We use your details only to respond to this enquiry. We never sell or share them.

How we execute it

From enquiry to handover.

Six defined stages. You always know which one you are in and what closes it.

01

Drawing & BOQ review

We review architectural and structural drawings against the BOQ and raise discrepancies before, not during, execution.

02

Foundation

Excavation, PCC, footing reinforcement and casting with documented cover and cube testing.

03

Structure

Columns, beams and slabs executed floor by floor with line, level and reinforcement checks at each stage.

04

Masonry & services

Blockwork and plaster progress in coordination with electrical and plumbing conduiting so nothing is broken open later.

05

Finishing

Waterproofing, flooring, joinery and painting to the specified finish schedule.

06

Handover

Snag list closure, as-built drawings, test certificates and a complete quality file.

Equipment

  • Concrete mixers, pumps and vibrators
  • Tower hoists and material lifts
  • Bar bending and cutting machinery
  • Scaffolding and shuttering systems
  • Survey and level instruments

Team on the job

  • Project engineer and site engineers
  • Quality and safety supervisors
  • Skilled masons, bar benders and carpenters
  • In-house electrical supervisor for MEP interface

Compliance governing this work

  • Registered Civil Contractor — Government of Maharashtra
  • Electrical Contractor Licence covering the MEP electrical scope
  • Scaffolding inspection and height-work controls
  • PF, ESIC and labour licence for every worker on site
See every licence and registration

On site

Building Construction in execution.

These slots are reserved for MGP's own site photography of this exact service.

Before you commit

Questions buyers actually ask.

Answered directly, including where the honest answer is a qualification rather than a yes.

Yes. Because we hold both civil and electrical licences and run our own facility manpower, we can take a building from foundation to occupancy-ready without handing the electrical or finishing scope to a third party.