Civil & Infrastructure
Building Construction
Factories, offices, hospitals and institutional buildings.
Hero photograph
Industrial building under construction with RCC frame and scaffolding, MGP site engineers reviewing drawings in the foreground with helmets on.
What this service is
In plain terms.
A building is delivered, not merely built. Between the foundation and the handover sit structure, masonry, plaster, waterproofing, flooring, joinery, painting and the mechanical, electrical and plumbing services that have to be coordinated with all of it. MGP executes industrial sheds and factory infrastructure, commercial and office buildings, hospital and institutional structures, and residential works — with the MEP interface handled in-house because we hold the electrical licence ourselves.
Scope of work
What a standard engagement includes. Anything outside this is quoted separately and agreed in writing before it is executed.
How we execute it
From enquiry to handover.
Six defined stages. You always know which one you are in and what closes it.
Drawing & BOQ review
We review architectural and structural drawings against the BOQ and raise discrepancies before, not during, execution.
Foundation
Excavation, PCC, footing reinforcement and casting with documented cover and cube testing.
Structure
Columns, beams and slabs executed floor by floor with line, level and reinforcement checks at each stage.
Masonry & services
Blockwork and plaster progress in coordination with electrical and plumbing conduiting so nothing is broken open later.
Finishing
Waterproofing, flooring, joinery and painting to the specified finish schedule.
Handover
Snag list closure, as-built drawings, test certificates and a complete quality file.
Equipment photograph
Slab concreting in progress with pump, vibrator and finishing team.
Equipment
- Concrete mixers, pumps and vibrators
- Tower hoists and material lifts
- Bar bending and cutting machinery
- Scaffolding and shuttering systems
- Survey and level instruments
Team on the job
- Project engineer and site engineers
- Quality and safety supervisors
- Skilled masons, bar benders and carpenters
- In-house electrical supervisor for MEP interface
Compliance governing this work
- Registered Civil Contractor — Government of Maharashtra
- Electrical Contractor Licence covering the MEP electrical scope
- Scaffolding inspection and height-work controls
- PF, ESIC and labour licence for every worker on site
On site
Building Construction in execution.
These slots are reserved for MGP's own site photography of this exact service.
Site photograph 1
Slab concreting in progress with pump, vibrator and finishing team.
Site photograph 2
Block masonry wall with electrical conduiting being laid in coordination.
Site photograph 3
Completed factory shed interior with epoxy flooring and lighting.
Site photograph 4
Hospital building corridor at finishing stage with clean flooring and painted walls.
Before you commit
Questions buyers actually ask.
Answered directly, including where the honest answer is a qualification rather than a yes.
Yes. Because we hold both civil and electrical licences and run our own facility manpower, we can take a building from foundation to occupancy-ready without handing the electrical or finishing scope to a third party.
Building Construction across Maharashtra
More in Civil & Infrastructure
Need building construction?
Send us the site details and the scope you have in mind. If a survey is the sensible first step, we will say so rather than quoting blind.