11 KV, 22 KV and 33 KV overhead and underground networks.

What this service is

In plain terms.

HT and LT installation is the distribution backbone of any industrial or infrastructure site. It covers the overhead lines and underground cables that bring power in at high tension, the switchgear and panels that control it, and the LT distribution that delivers it to the load. It is licensed work for a reason: an error here is not a defect, it is a fatality.

Scope of work

What a standard engagement includes. Anything outside this is quoted separately and agreed in writing before it is executed.

11 KV, 22 KV and 33 KV overhead line erection
HT and LT underground cable laying
Cable termination, jointing and glanding
HT and LT panel installation and interconnection
Single line diagram preparation and design support
Earthing system design and installation
Testing, pre-commissioning checks and energisation support
Statutory inspection liaison and clearance

Enquire about this service

An engineer who works on this specific service will call you back.

We use your details only to respond to this enquiry. We never sell or share them.

How we execute it

From enquiry to handover.

Six defined stages. You always know which one you are in and what closes it.

01

Design & SLD

We prepare or review the single line diagram, load calculation and protection scheme before any material is ordered.

02

Material approval

Cable, switchgear and accessory makes are approved by you against the specification.

03

Installation

Lines erected or cables laid with correct bending radius, supports, route markers and identification.

04

Termination

Terminations and joints made by licensed personnel using type-approved kits.

05

Testing

Insulation resistance, earth resistance, continuity and protection testing with recorded values.

06

Energisation

Statutory inspection coordinated, clearance obtained and the system energised under controlled conditions.

Equipment

  • Insulation resistance and high-voltage test sets
  • Earth resistance testers
  • Cable laying rollers, winches and jointing kits
  • Crimping and glanding tool sets
  • Hydraulic platforms for overhead work
  • Arc-rated PPE and insulated tooling

Team on the job

  • Licensed electrical supervisor
  • Certified wiremen and jointers
  • Testing engineer
  • Safety officer for LOTO and energisation control

Compliance governing this work

  • Electrical Contractor Licence — Government of Maharashtra
  • Licensed supervisor and wiremen on every job
  • Lock-out / tag-out procedure for all live work
  • Statutory inspection clearance before energisation
See every licence and registration

On site

HT & LT Installation in execution.

These slots are reserved for MGP's own site photography of this exact service.

Before you commit

Questions buyers actually ask.

Answered directly, including where the honest answer is a qualification rather than a yes.

Yes. We prepare the SLD, load calculation and protection coordination, or review and correct an existing one before execution begins.